Hoggard High School
Additions included a new 1,600 seat main gymnasium with support facilities and expansion of the existing cafeteria/kitchen. The current gymnasium will serve as the auxiliary gym. The cafeteria/kitchen expansion was required to meet the needs of the current student population and was designed to meet the educational specifications adopted by the Board of Education. Site improvements for vehicular and pedestrian traffic flow, and for compliance with state stormwater requirements and local zoning ordinances. Moderate renovations were done to the existing buildings (A-C) to address the building systems and infrastructure needs, and create an appropriate learning environment.
Hoggard Renovation cost $16,424,781
NHCS Project Manager: Irene Sotiriou
Designer: Bowman Hemingway Murray Architects
Contractor: Monteith Construction Corporation
Completed: summer 2017